Overview
Work Cycle is the schedule section in the Hire / Edit Employee form. It controls when the employee wakes on its own. Manual runs from the drawer still work regardless of schedule.How to configure
- Open Hire → Open position or employee drawer → Edit
- Find Work Cycle
- Pick a cadence (Time / Day / Week / Month / Interval / None — labels as shown in the builder)
- Set Timezone in Advanced settings if needed
- Save
None vs scheduled
- None — no automatic wake-ups; run only when you (or another trigger) invoke the employee
- Any other cadence — Tess computes the next wake-up from your selection and timezone
Where to monitor next wake-ups
- Employee drawer schedule badge
- Mission Control / Day Planner on the Mesh for upcoming wake-ups
Tips
- Leave Work Cycle on None while you refine work instructions; invoke manually first
- Match interval length to how long a typical run takes so runs do not stack
- Confirm timezone for distributed teams